ProductUpdated on 4 February 2025
TRIUS Aqua RPE prefabricated liners, 5x faster installation
About
Traditional liner installation is time-consuming, costly, and highly dependent on weather and site conditions. On-site fabrication leads to excess waste, higher labor costs, and increased risks.
Our prefabricated TRIUS Aqua RPE liner technology changes this by manufacturing large, custom-sized and shaped panels in a controlled factory environment. Like prefabricated houses, 80% of the work is done before installation, significantly reducing on-site time and effort.
The result is a faster, more efficient, and cost-effective solution that allows installers and even end users to complete projects up to 5x faster. Less waste, lower CO₂ emissions, and no need for material storage - a game-changer for water containment projects.
✅ Get in touch with us to find out how TRIUS Aqua RPE liners can speed up your projects!
Similar opportunities
Product
- Importer
- Publisher
- Wholesaler
- Distribution Partner
Arnaud decrombrugghe
Commercial Director at Biodynamizer
Bruxelles, Belgium
Expertise
UV-C specialist for recycling and disinfecting liquids and water
- Maritime
- Healthcare
- Environment
- Space and Aerospace
- Leisure and Recreational
- Nano and Microtechnologies
- Biotech, Pharma and Cosmetics
- Tourism and Cultural Heritage
- Home Furnishing and Housewares
- Food, Beverages and Agriculture
- Materials, Textiles and Chemicals
- Industrial Equipment and Machinery
- Automotive, Transport and Logistics
Julio ASENCIO
UV RER Export Manager at UV RER
SAINT-GENIS-LAVAL, France