ProductUpdated on 4 September 2024
KONEKTA2
About
KONEKTA2 can be preinstalled onshore, at cable factory, allowing onshore tests as well. Then, preterminated dynamic cables can be towed in single drums to the wind farm. Offshore manoeuvre is simplified, shortened, and big Cable Laying Vessels can be avoided.
Applies to
- Assembly & Installation
- Components Supply
- Operations & Maintenance
Attached files
Similar opportunities
Product
- Assembly & Installation
- Operations & Maintenance
- Freight, Logistics & Transportation
Nils Olschner
Director Sales & Business Development at Uudenkaupungin Työvene OY
Uusikaupunki, Finland
Product
Launching of floating substructures
- Assembly & Installation
- Operations & Maintenance
- Freight, Logistics & Transportation
Lucas Lowe-Houghton
CRO at Tugdock Limited
Falmouth, South West, United Kingdom
Service
Floating Wind, Engineering, Survey & Subsea,Marine Operations, UAV Services
- Environmental
- Assembly & Installation
- Operations & Maintenance
- Freight, Logistics & Transportation
Michael Abrol
Business Development Manager at Interocean Marine Services Limited
Middlesbrough, United Kingdom