Business-to-Business Meetings at Floating Offshore Wind 2024

9–10 Oct 2024 | Aberdeen, United Kingdom

ProductUpdated on 4 September 2024

KONEKTA2

Ibon Larrea Astobiza

Chief Technical Officer at DITREL INDUSTRIAL, S.L.

Vitoria-Gasteiz, Spain

About

KONEKTA2 can be preinstalled onshore, at cable factory, allowing onshore tests as well. Then, preterminated dynamic cables can be towed in single drums to the wind farm. Offshore manoeuvre is simplified, shortened, and big Cable Laying Vessels can be avoided.

Applies to

  • Assembly & Installation
  • Components Supply
  • Operations & Maintenance

Similar opportunities