Project cooperationUpdated on 9 February 2025
Energy modernization of logistics complexes (LC).
About
Conditions for the implementation of the pilot project: installation of solar collectors on the roof of the logistics complex (LC), use of the installation developed by us for long-term, environmentally friendly, economical storage of excess solar energy. The project for the LC allows: increasing energy sustainability, heating frosty atmospheric air in winter in front of ventilation systems, saving up to 20% of high-potential heat, increasing the efficiency of photovoltaic panels due to their cooling, and more. A proposed work plan has been developed.
Stage
- Early
Type
- Technical
- Financing
Similar opportunities
Project cooperation
Installation of pre-heating of frosty air in front of ASHP and HVAC.
- Early
- Technical
- Financing
Igor Varavva
director at ETC Avtomatika
Kyiv, Ukraine
Project cooperation
A complex of long-term storage of solar/wind energy.
- Early
- Technical
- Financing
Igor Varavva
director at ETC Avtomatika
Kyiv, Ukraine
Project cooperation
A complex of long-term storage of solar/wind energy.
- Early
- Technical
- Financing
Igor Varavva
director at ETC Avtomatika
Kyiv, Ukraine