Project cooperationUpdated on 6 February 2025
Copper flow battery pilot
About
We are proposing a development and piloting of a 1MWh CFB battery system that fits in two TEU shipping containers. This system can be configured from 4 to 8 hour storage duration depending on project parameters, for 2 types of applications. Firstly, with an energy-intensive company can perform energy arbitrage and cost saving by storing electricity during lower hours during the spot market for use when prices are high. Secondly, co-located with either wind or solar generators for peak shifting of over-produced electricity, hence generating revenue over longer hours and reducing the curtailment costs.
Our technology has a 30% lower levelized cost of storage than established Li batteries with 5 times longer cycle lifetime, due to our non-degrading electrolyte and cost-effective battery stack manufacturing process.
Stage
- Early
- Planning
Type
- Technical
- Sales/Distribution
- Financing
Organisation
Similar opportunities
Partnership
Partnership on EU-funded battery pilot
Paul Wong
CEO / Co-founder at Halide Energy
Espoo, Finland
Service
- Others
- Energy
- Engineering & Technology
Richard Ryan
Commercial Director at Gridimp Ltd
Wells, United Kingdom
Product
3MW superconductor megawatt charger
Antonio Gutiérrez Gómez
CEO at Blowin' in the wind SL (BLOWIND)
Sevilla (España), SEVILLA, Spain